Hydraulic infrastructure and hydrogeological arrangement.
Interventions aimed at the construction of aqueducts, sewerage networks and sewage treatment plants, the preservation and protection of natural and environmental resources, through hydraulic forestry works, the re-functionalization of hydraulic regimentation works, and the consolidation of slopes and torrential riverbanks, favoring naturalistic engineering methodologies and techniques.
Project Info
Soil protection measures – hydrogeological arrangement of the Monti Creek.
Client: Municipality of Durazzano
Cost: €566,986.25
Year of completion: 2017
Final and executive design
The project takes into account spatial aspects through vegetation, hydraulic and geo-pedological analyses. The interventions are based on naturalistic engineering techniques, respecting the environment and morphology of the intervention sites and using environmentally friendly techniques and materials.
Project Info
Regulation of the confluence of the Sele and Calore Lucano rivers, adjustment and shaping of the existing banks of the Sele River.
Client: Municipality of Capaccio
Cost: €15,099,600.29
Year of completion: 2017
Executive design
The project is part of a larger program of works to regulate water levels in the stretch of the Sele River between the confluence of the Calore River upstream of Ponte Barizzo and the river mouth. The project aims to “Safeguard” the Sele River through technical solutions for the adaptation of the river banks, taking into account the characteristics of the existing vegetation.
The project included excavation work to regulate runoff in the floodplain in order to reduce flood flow velocity, to connect hydraulic sections in a planoaltimetric manner, and to recover excavated material” for reconstruction of the of the project embankments, which is a significant economic benefit.
In addition, the following issues were resolved: modification and integration of the Consortium’s intake structure on the left bank of the Sele River to eliminate interference with flood flow; definition of access ramps to the to river floodplain areas and feeder channels; elimination of the interference between the project works and the existing municipal sewage treatment plant on the left bank of the river, as well as ancillary works (included within the economic limits of available funds).
Project Info
Municipality of Capaccio Paestum: completion and optimization of the municipal sewage system, transfer of wastewater to the treatment plant.
The main objective of the project is to complete the sewerage system and connect domestic, agricultural and industrial users to this system.
Specifically, these are interventions on the discharge distributors and lift stations with associated hydraulic pressure operation, located downstream of the project lift stations.
Project Info
Municipality of Capaccio Paestum: Project for the environmental rehabilitation and safety improvement of the rock face above the village of Capaccio at “Madonna del Granato”.
The measure aims to secure part of the rocky ridge above S.P. 13 a, which is the main artery for the direct connection from Capaccio to Madonna del Granato, where the sanctuary of the same name, a tourist site of high cultural interest, is located.
Selective and localized interventions such as rockfall barriers and the laying of a protective net are planned.
Project Info
Municipality of Bonea: Completion of municipal sewer system
Design level: Final and executive design
The project included some road sections in the municipality of Bonea, connecting an area of about 90 hectares to the new network.
Project Info
Municipality of Arpaia – maintenance works for hydrogeological instability of valleys, embankments and landslides, carried out on behalf of provinces and municipalities.
Final and executive design
The project focused on protecting riverbanks through naturalistic engineering measures such as gabions.
Project Info
Municipality of Paolisi
Final and executive design
The project involved the naturalistic enhancement of the valley in front of the city center through the construction of wooden and stone weirs.
Project Info
Municipality of Rotondi – “Redevelopment of Via Madonna della Stella and the square in front of the Sanctuary of the Madonna della Stella.”
Final and executive design
The design dealt with improving the safety of Madonna della Stella road with measures such as the construction of rockfall barriers and the redesign and subsequent widening of the sharp bends.
Project Info
“Extension of sewerage system in Villani Street and Braglio Street, extension of water supply system in Braglio Street.”
Client: Municipality of Schio
Year of completion: 2021
Technical and economic feasibility study, final design and executive design
Project Info
“Extension of the water network in the eastern part of the municipality with simultaneous renewal of some sections of the sewer network and extension of the Piazzon elevator.”
Client: Municipality of Creazzo
Year of completion: 2021
Technical and economic feasibility study, final design and executive design
Project Info
“Renewal of water distribution network in Via Redi, Genoa,
Livorno, Sandri and Menti.”
Client: Municipality of Valdagno
Year of completion: 2021
Technical and economic feasibility study, final design and executive design