Network infrastructure

Experience gained in network and point infrastructure. Functional network works to ensure an organic unfolding of relations between the various activities through which a community develops its settlement in the territory. Transportation network and technological facilities.

Project Info

Connection of primary urbanization of the plan for production settlements at “San Benedetto” location.

Client: Municipality of Caserta

Work: Executive and final design

Cost: €1,766,819.51

Year: 2014

 

 

Project Info

RENEWAL OF A14 MOTORWAY SAFETY GUARDRAIL Trunk Directions DT3 (Bologna) and DT7 (Pescara)

The project is for design services, including surveying and safety coordination during the design phase and technical support during construction, for the arrangement of guardrails in front of DM 223/92, to be carried out on sections DT3 and DT7 for a length of about 40 km.

Client: Autostrade S.P.A.

Level of Design: Preliminary, final and executive design, CSP, technical assistance for construction

Cost: €46,528,345.24

Year: 2021

 

 

Project Info

PARKWAY

The project aims to build a road infrastructure linking the Valle Calore road with the municipality of Vallodella Lucania, in order to create a transversal road system between the two main axes of penetration of the territory of Cilento Vallo di Diano and Alburni National Park, namely the A2 freeway and the SS 18 ring road. The entire route will be built on a new section of 13,260 m (3,381 m in viaduct, 4,717 m in tunnel, 5,162 m in embankment/ditch) and on 2,314 m by adapting the existing roadway.

Client: Campania Region

Level of Design: technical and economic feasibility project.

Cost: €362,591,370.69

Year: 2021

 

 

Project Info

COMPLETION OF SALERNO BACKPORT ROAD

The Supreme Council of Public Works requested a complete review of the functionality of the intersection, as the execution of the final design, which had been put out to bid, was deemed inadequate to meet the practical needs of the new road system. The primary goal was to allow traffic to flow smoothly, taking into account all possible roads entering and leaving this road network node, considering their scope and importance.

Client: Campania Region

Level of Design: preliminary design options document, Preliminary, final and executive design

Cost: €36,156,878.33

Year: 2022

 

 

Project Info

MAINTENANCE AND SAFETY IMPROVEMENT OF TUNNELS, BRIDGES, AND VIADUCTS

The project concerns executive design services for the extraordinary maintenance of bridges, viaducts and tunnels of the ANAS road network in the Calabria region.

Client: ANAS S.P.A.

Level of Design: Executive Design

Cost: €135,000,000.00

Year: 2021

 

 

Project Info

HEAT VALLEY FUND COMPLETION 1ST LOT

A stretch of about 5,100 meters, entirely in the Municipality of Aquara, which starts from State Road 166 (at km26+800) and joins the section of the Fondovalle Calore under construction in Mainardo.

Client: Campania Region

Level of Design: Final Design

Cost: €31,468,155.86

Year: 2021

 

 

Project Info

HEAT VALLEY FUND COMPLETION 1ST SECTION

The section of road under discussion here is part of a larger route of the Calore Salernitano valley floor road that, when completed, will have a total length of more than 21 km and will pass through the municipalities of Serre, Postiglione, Controne, Castelcivita and Aquara, all located at the foot of the Alburni massif, on the hydrographic right of the Calore Salernitano.

Client: Campania Region

Level of Design: Final Design

Cost: 55,938,000.00

Year: 2019-2022

 

 

Project Info

HEAT VALLEY FUND COMPLETION 1ST SECTION

The section of road under discussion here is part of a larger route of the Calore Salernitano valley floor road that, when completed, will have a total length of more than 21 km and will pass through the municipalities of Serre, Postiglione, Controne, Castelcivita and Aquara, all located at the foot of the Alburni massif, on the hydrographic right of the Calore Salernitano.

Client: Campania Region

Level of Design: Final Design

Cost: 55,938,000.00

Year: 2019-2022

 

 

Project Info

ROAD WIDENING AT THE INTERSECTION WITH CASTIGLIONE

The track on which the intervention takes place skirts the hill of Ravello through sharp turns that reach the back of the town hill. This section is part of a larger route within state highway SS373. The goal of the project is to improve the functionality of a section of SS373 by widening the roadway to allow traffic in both directions.

Client: Campania Region

Level of Design: Final Design

Cost: €3,011,082.18

Year: 2019-in-progress